Skip to content
  • About
  • Submit
  • Jury
  • The Lecture
    • The 2021 Takshila Lecture on Architecture & Society | Níall McLaughlin
    • The 2018 Takshila Lecture on Architecture & Society
  • The Process
  • Past Cycles
    • 2020-21
    • 2018-19
    • 2016-17
    • 2015-16
  • FAQs
  • Matter
  • Takshila
The Shortlist 2018-19 Cycle

Toilet in A Courtyard

Posted July 12, 2019 Matter

Project: Toilet in A Courtyard
Architect: RC Architects
Programme: Public toilet
Location: Bandra Station Platform-1, Mumbai
Site area: 110 sqm
Built Up area: 95 sqm
Year of Commencement: 2016
Year of Completion: 2017


13-Junction-of-Stone-and-Perforated-metal
14-Perforated-panel-and-court
15-Roof-Junction
16-Lighting-detail-in-roof
17-Roof-light
18-Stone-wall-junction-and-detail
19--Entrance-lobby-looking-on-to-the-railway-platform
20---Connection-with-the-platform
01-Front-facade
02-Courtyard-from-entry
03-Courtyard-from-entry-with-lights
04-Entry-to-women-toilet
05-Handicapp-toilet
06-Looking-out-from-courtyard-through-entry
08-Male-toilet-passage
09-Between-the-stone-walls
10-Early-Morning-Boy-sitting-in-the-courtyard
11-Colour-palette
12-Junction-of-Concrete-and-Perforated-metal
07--Urinals
06-Front-Elevation
06-Handicap-toilet
07-Female-toilet-entry
Sketch-01--From-the-Platform
Sketch-02---Main-Entry
Sketch-03---Main-Entry-+-Handicap-Entry
Sketch-04---Male-toilet-
Sketch-05---Courtyard
Sketch-06---Courtyard-from-Male-toilet
Sketch-07---Isometric
Sketch-08---Exploded-Isometric
00-Concept-Diagram
01-Entry-level-plan
01-Male-and-Female-toilet
02-People-in-que-for-male-toilet
02-Public-Space-Diagram
03-Female-toilet-and-wash-basin
03-Roof-framing-plan
04-Existing-toilet-facility
04-Roof-plan
05-Entry-Exit-points
05-Section-through-courtyard

 

Share this:

  • WhatsApp
  • Facebook
  • Twitter

Post navigation

⟵The Atelier
Drishti Ferry Terminal⟶
Create a website or blog at WordPress.com aThemes.
 

Loading Comments...